Order intake
The PO becomes the plan, with its dates and documents
-
1
Each railway PO is entered with its documents. Drawing revision, specification, inspection agency, consignees and delivery schedule are on it.
-
2
Lots are created against the PO lines. Raw material is reserved by heat, so the certificate is available before production starts.
-
3
The order dashboard shows every PO line. In production, awaiting inspection, inspected and dispatched are visible per line.
PO-line status from material to dispatch