Step 1 · Roll inspection
Grade the roll before it reaches the cutting table
-
1
The inspector scans the roll tag from the GRN and enters width and length. Each defect is photographed and logged with its distance from the roll start.
-
2
The app assigns 1 to 4 points per defect and totals them per 100 square yards. The roll is graded pass, commercial or reject against the limit set for that buyer.
-
3
Defect positions go to the spreading plan in the ERP. The cutter sees where to skip, and the roll certificate goes to the fabric supplier if there is a claim.
PDF certificate with QR per roll