ERP glossary for manufacturers

In short

This glossary defines 71 terms that come up when a factory chooses and runs an ERP: general ERP vocabulary such as BOM, MRP and WIP; GST terms such as IRN, e-way bill and ITC-04; and trade terms from textile and engineering plants such as KPO, shade lot, heat number and PPAP.

By the eManage implementation team, Ludhiana Updated

Illustration: ERP glossary for manufacturers

Terms A–C

Aggregate annual turnover (AATO)
Total turnover across all GST registrations under one PAN, used to decide thresholds such as e-invoicing and ITC-04 frequency.
AQL
Acceptable quality limit: the maximum defect rate accepted in a sampled inspection lot, common in garment final inspection.
Audit trail
A record of who created or changed each document, and when.
Backward scheduling
Planning each stage of production back from the delivery date, using lead times. More on Backward scheduling
Batch
A quantity produced together under the same conditions, such as a dye batch, and tracked as one unit.
Bill of materials (BOM)
The list of materials and quantities needed to make one unit of a product, including process losses. More on Bill of materials (BOM)
Bundle
A group of cut garment pieces that moves through stitching together, used for line WIP and piece-rate wages.
Capacity planning
Checking whether machines and people can produce the planned quantity in the time available.
Challan
A document that accompanies goods without a sale, such as a delivery challan for job work. More on Challan
Cloud ERP
ERP hosted in a data centre and used over the internet. More on Cloud ERP
Consignee
The party to whom goods are delivered, which may differ from the buyer who is billed.
Cost sheet
The actual cost of an order or lot: material, conversion, job work, rejection and overheads.
Count
The fineness of yarn, such as 30s, used as an attribute of yarn stock in spinning and knitting.

Terms D–G

Delivery schedule
A customer's list of quantities and dates, often monthly from OEMs, against which dispatch is made.
Discrete manufacturing
Making countable units from parts, such as fasteners or auto components. More on Discrete manufacturing
Dispatch
Sending finished goods to a customer, the point at which invoice, e-invoice and e-way bill are created.
Doff
A completed set of output removed from a machine, such as a fabric piece from a loom or cones from a ring frame.
E-invoice
A B2B invoice registered on the government Invoice Registration Portal, which returns an IRN and signed QR code. More on E-invoice
E-way bill
An electronic document required for movement of goods above a value threshold, with invoice and vehicle details. More on E-way bill
Edition
A version of an ERP built for one trade, with that trade's masters, documents and reports. More on Edition
ERP
Enterprise resource planning: software that runs every department on one shared database. More on ERP
Finished goods
Products that have completed production and inspection and are ready for dispatch.
Gate entry
The record made when a vehicle or material enters or leaves the plant. More on Gate entry
Goods receipt note (GRN)
The document recording material received against a purchase order, which creates stock.
Greige (grey) fabric
Fabric straight from knitting or weaving, before dyeing or finishing.
Gross requirement
The total material an order needs, before stock and open orders are subtracted. More on Gross requirement

Terms H–L

Heat number
The identifier of a steel melt, carried on material and parts for traceability back to the mill certificate.
HSN code
Harmonised System of Nomenclature code that classifies goods for GST.
Implementation
The project that takes a business from its old records to running on an ERP. More on Implementation
Inspection plan
The checks to be made on an item or drawing at receipt, in process and before dispatch.
Inventory
Stock of raw material, work in progress and finished goods, by item, lot and location.
IRN
Invoice Reference Number, the unique number returned by the Invoice Registration Portal for an e-invoice.
ITC (input tax credit)
GST paid on purchases that can be set off against GST payable on sales.
ITC-04
The GST form in which a principal reports goods sent to and received from job workers. More on ITC-04
Job card
An instruction to produce a quantity through a routing, and the record of what actually happened.
Job work
Processing by an outside party on material owned by the principal manufacturer. More on Job work
KPO
Knitting programme order: the instruction to knit a fabric quality from specified yarn lots. More on KPO
Lead time
The time needed to buy or make an item, used to schedule when to start.
Lot
A quantity of material with one identity, such as a yarn lot or production lot, tracked through the process.

Terms M–P

Master data
The reference records an ERP depends on: items, parties, BOMs, routings, ledgers.
Mixing
In spinning, the blend of cotton bales or fibres planned for a lot of yarn. More on Mixing
Module
A part of an ERP responsible for one set of records, such as inventory or quality. More on Module
MRP
Material requirements planning: calculating what material to buy or make, how much and when. More on MRP
Net requirement
Gross requirement minus stock and material on order, plus any safety stock. More on Net requirement
On-premise ERP
ERP installed on a server owned by the business, usually in the plant. More on On-premise ERP
Piece rate
Wages paid per unit of output rather than per day or month, common in garment and engineering units.
PPAP
Production part approval process: the evidence an auto-component supplier gives an OEM that a part meets requirements. More on PPAP
PPM
Parts per million defective, a quality measure used by OEMs to rate suppliers.
Principal
Under GST job work, the registered person who owns the material sent for processing.
Process manufacturing
Production where material changes form by weight or volume, such as dyeing or spinning. More on Process manufacturing
Process loss
The expected reduction in quantity during a process, recorded in the BOM.
Purchase order (PO)
An approved order to a supplier for material or services at agreed terms.

Terms Q–S

QC hold
A status that blocks a lot from issue, packing or invoicing until it passes inspection.
Rack (bin) location
The exact storage place of a lot in the store, recorded so it can be found and picked. More on Rack (bin) location
RDSO
Research Designs and Standards Organisation, which approves vendors and standards for Indian Railways. More on RDSO
Recipe
In dyeing, the dyes and chemicals per kilo of fabric for a shade, scaled to the batch weight. More on Recipe
Rejection
Output that fails inspection and is scrapped, downgraded or sent for rework.
Reprocess
Running a failed batch through a process again, such as re-dyeing, recorded as a cost.
RGP and NRGP
Returnable and non-returnable gate passes for material leaving the plant without a sale.
Routing
The sequence of operations a product follows, with the machines or work centres used.
Safety stock
Extra stock kept to protect against late supplies or demand changes.
Sale order
A confirmed customer order with items, quantities, prices and delivery dates.
Shade lot
A group of dyed material with the same shade, kept together so a customer's order matches.
Shortage
The quantity missing between what was sent to a job worker and what came back, beyond the allowance. More on Shortage
Size ratio
The proportion of sizes in a garment order or carton, used in cutting and packing.

Terms T–Z

Total cost of ownership (TCO)
The full cost of an ERP over several years, including licences, implementation, support and hardware. More on Total cost of ownership (TCO)
Traceability
The ability to follow a product back to the lots, heats, machines and people that made it.
Unit of measure (UOM)
The unit in which an item is counted, such as kg, metre, piece or dozen, with conversions between them.
Work centre
A machine, line or group where an operation is performed and capacity is planned.
Work in progress (WIP)
Material issued to production that is not yet finished goods.
Yield
Good output as a share of input, the key efficiency number in process manufacturing.

Questions buyers ask

What does BOM mean in ERP?

BOM means bill of materials: the list of materials and quantities needed to make one unit of a product, including process losses. MRP uses it to calculate material requirements.

What does WIP mean in manufacturing?

WIP means work in progress: material that has been issued to production but is not yet finished goods.

What is a KPO in knitting?

A KPO, or knitting programme order, is the instruction to knit a fabric quality from specified yarn lots, against which knitted rolls are received and yield is measured.

What is a heat number?

A heat number identifies the steel melt a piece of material came from. Carrying it through production links each part back to its mill test certificate.

Read next What is ERP? The plain-language definition, with a plant example